We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies.
Better design of industrial facilities and laboratories improves the quality of life of employees
Architecture & design, Consulting, Technical assistance
Urban planning
148.902,81 € (423.245.273,36 $COP)
Completed 2018
The architectural design, structural calculation, electrical design and network points of the microbiology laboratory were developed in the second level of the • in the plant located on the Funza-Siberia Km 3 road, zone
Franca of the municipality of Funza, Cundinamarca
The design was developed without compromising the current structure, in such a way that it complies with current regulations, NSR-10 and with design and construction parameters in accordance with current regulations and covering the constructive part, ergonomic improvements, safety in work and practices of friendly use with the environment to
the materials.
• Survey of existing information.
• Architectural Design.
• Structural and Foundation Design.
• Hydrosanitary and Rainwater Design.
• Electrical and Lighting Design
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies.
B04 - Laboratory design for the PEPSICO plant in the Free Trade Zone of Funza, Cundinamarca. (Colombia)
Funza, Cundimarca
Markets:
URBAN PLANNING , ENVIRONMENTAL STUDIES & PLANNING , INDUSTRIAL ,
Services:
ARCHITECTURE & DESIGN ENGINEERING STUDIES CONSTRUCTION MANAGEMENT ENVIRONMENTAL SERVICES PROGRAM, ADVISORY & PROJECT MANAGEMENT
Client:
PEPSICO—COMERCIALIZADORA NACIONAL S.A.S