We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies.
Encourage the inhabitants of the prioritized settlements to access the quality of urban life
Consulting, Technical assistance
Urban design and planning
1.849.138,91 € (4.540.480.700,00 $COP)
Completed 2017-2018
Final studies were carried out for the construction of the improvement works in the comprehensive intervention Ciudad Bolívar Borde Soacha, for which complementation, rearrangement, and adaptation actions required in the urban space were developed to encourage the inhabitants of the prioritized settlements to access the quality of urban life
A diagnosis of the prioritized areas was generated by the District Secretary of Habitat in the respective components of which the studies and designs were carried out. At the same time, participation mechanisms were implemented with the communities of these territories.
• Soil and environmental
• Public services
• Equipment
• Accessibility / Mobility
• Public space
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies.
C08 -Studies and designs for the construction of the improvement works in the integral intervention in Ciudad Bolívar on the edge of Soacha. (Colombia).
Soacha, Colombia
Markets:
URBAN PLANNING ,
Services:
ARCHITECTURE & DESIGN ENGINEERING STUDIES CONSTRUCTION MANAGEMENT ENVIRONMENTAL SERVICES PROGRAM, ADVISORY & PROJECT MANAGEMENT
Client:
DISTRICT SECRETARIAT OF HABITAT — BOGOTÁ TOWN HALL