The construction of an access road to the Valencia racing circuit was necessary

  • Include:

    Consulting, Project Management

  • Area:

    Roads-Highways

  • Cost:

    € 3.912.037,87

  • Status:

    Completed 1996-1997

Construction Of The Access To The Valencia

The fundamental objective of this project is the construction of the access to the Valencia racing circuit. The road leading to the Valencia racing circuit has a total length of 3082.27 meters and is entirely located in Cheste. It begins at the CV-378, which connects the A-3 with Cheste, near the city industrial area and the north end of it. The connection is made via a roundabout, 54 meters internal diameter, with a 164 meters long connection to the previously mentioned industrial area, also part of the project. From this point, the road passes by La Loma, crossing it in the southeast-northwest direction, then enters in the Cheste Educational Complex - Previous University - and heads for the road, making the connection with the racing circuit interior and leading to its parking areas located on the future terrace zones.  
 

Description Planned Section

The planned section consists of two 3.00 m wide lanes with 2.00 m wide roadsides. The road has access control, due to the type of expected use during operation thereof. Therefore, there are four points of connection with the existing rural roads, allowing access to adjacent properties and supplemented by several service roads.
 

The Work Includes The Replacement Of All Relevant Services

Electricity, telephone, lighting, irrigation networks, rural roads, etc.. and completed by the lighting installation on the initial roundabout and its access roads, such as the access road to the Industrial hub and the roundabout and interior roads of this same hub.
 