Construction Project Redaction (VP-3076): C-322 from Navarrés and CV-550 from Anna a Dos Aguas, Anna’s roundabout.

Anna, Spain

  • Markets:

    MASTER PLANNING , ROADS, HIGHWAYS, BRIDGES AND TUNNELS , ENVIRONMENTAL STUDIES & PLANNING ,

  • Services:

    ARCHITECTURE & DESIGN ENGINEERING STUDIES CONSTRUCTION MANAGEMENT ENVIRONMENTAL SERVICES PROGRAM, ADVISORY & PROJECT MANAGEMENT

  • Client:

    Generalitat Valenciana / Consellería de Infraestructuras y Transporte

Safe roundabouts are a good option for connecting two roads

  • Include:

    Consulting, Project Management

  • Area:

    Roads-Highways

  • Cost:

    €2 229 201,16

  • Status:

    Completed 2001-2004

The passage through Anna

The passage through Anna is characterized by its narrow road and the flow intensification disrupting traffic conditions and safety. For these reasons, it was decided to undertake Anna roundabout work in the west of the city, freeing it from the traffic flowing through it.
 

Anna used to have an unsafe connection

The work involved the construction of a new road with a length of 2030 m in the west of the city, with three intersections
type roundabout giving access to it. In order to remove direct access properties adjacent to the road, it was built three
service roads with a total length of 857 m and a 260m long service road leaning against the road .
 