D13 - Studies and Designs for the Improvement, Rehabilitation and / or Paving of the Carretera San Gil — San Joaquin — Onzaga — Santa Rosita, department of Boyaca and Santander (Colombia)

San Gil, Onzaga, Santa Rosita , Colombia

  • Markets:

    URBAN PLANNING , ROADS, HIGHWAYS, BRIDGES AND TUNNELS , INDUSTRIAL ,

  • Services:

    ENGINEERING STUDIES ENVIRONMENTAL SERVICES PROGRAM, ADVISORY & PROJECT MANAGEMENT

  • Client:

    Instituto Nacional de Vías (INVIAS). Republica de Colombia.

Roads are the prime connectors between people, in this case between neighbours in Boyaca and Santander departments

  • Include:

    Studies, consulting, Design

  • Area:

    Roads - Highways

  • Cost:

    31 852 810,47 € (88 174 925 917,00 $COP)

  • Status:

    Completed 2016 - 2017

Departments of Santander and Boyaca

The road corridor object of the Studies and Designs for the Improvement, Rehabilitation, and/or Paving in Phase III, It is located on route 6403 that connects the departments of Santander and Boyaca. The vial studied has a total length of 24,850 km.

The roads studied and designs require various works executed by the consultants at IVICSA

• Study of traffic, capacity, and service levels.

• Layout and geometric design, signage, and road safety.

• Study of Geology for engineering and geotechnics.

• Soil study for the design of bridge foundations and other works.

• Study of stability and stabilization of slopes

• Geotechnical study for pavement design.

The works executed were distributed into the following tasks

• Study of hydrology, hydraulics and scour.

• Study and design of structures.

• Property management.

• Environmental and social study.

• Study of work quantities, APUs, budget, and specifications.

• Final executive report

We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies.