Design Study and Technical Assistance of the Collectors' Network Construction in The Union of Quart - Benager. Valencia

Benager Valencia, Spain

  • Markets:

    URBAN PLANNING , WASTEWATER TREATMENT & REUSE ,

  • Services:

    ARCHITECTURE & DESIGN ENGINEERING STUDIES CONSTRUCTION MANAGEMENT ENVIRONMENTAL SERVICES PROGRAM, ADVISORY & PROJECT MANAGEMENT

  • Client:

    Generalitat Valenciana / EPSAR (Entidad Pública de Saneamiento de Aguas Residuales)

The target is to obtain the canals’ decontamination which cross the area of Quart Benager's union

  • Include:

    Consulting, Project Management

  • Area:

    WWTP

  • Cost:

    2.216.425.768 pts

  • Status:

    Completed 1994-1998

The scope of the contract includes the redaction and a technical assistance for the works in the Quart Benager's union collectors network.

The constructed collectors network has for basic object to gather the urban and manufacturers waste water from the municipal areas of Quart-Benager's Union, composed by the municipalities Aldaia, Alaquas, Quart de Poblet, Xirivella, Manises and Mislata, as well as the waste water proceeding from the Valencia South Collector. The target is to obtain the canals’ decontamination which cross the area.
 

Results of the project

In total 12 collectors' sections were executed , totalizing a total length of more than 31 kilometres with diameters between 600 mm and 1.500 mm. there were also constructed 4 dumping stations, placed in Manises, Quart de Poblet, Mislata and Valencia, with design flows of 250 and 1.000 l/sg. It was installed a remote control in each of the stations with a protocol of communication connecting with the Quart Benager's WWTP.

We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies.