Draft Project for the Construction and Operation of the expansion of the WWTP Rafelguaraf, Valencia.

Rafelguaraf, Spain

  • Markets:

    URBAN PLANNING , WASTEWATER TREATMENT & REUSE , ENVIRONMENTAL STUDIES & PLANNING ,

  • Services:

    ARCHITECTURE & DESIGN ENGINEERING STUDIES CONSTRUCTION MANAGEMENT ENVIRONMENTAL SERVICES PROGRAM, ADVISORY & PROJECT MANAGEMENT

  • Client:

    Generalitat Valenciana / Consellería de Infraestructuras y Transporte

Draft Project about the expansion of the WWTP in Rafelguaraf, Valencia

  • Include:

    Consulting, Project Management

  • Area:

    WWTP

  • Cost:

    € 1.180.415,05

  • Status:

    Completed 2011

The network of the WWTP comprises the steps of:

This project consisted in the preparation of the draft Project about the expansion of the WWTP in the municipality of Rafelguaraf, Valencia.

• Filter Grille, new wells and water pump, transfer of two self-cleaning strainers, new biological reactor and secondary clarifier. • Execution of the slab for mud silos, generator, hypochlorite and deodorization. 
• Execution of a pump well and a drain pump. 
• Concerning the WWTP sludge circuit, the units required are: replacing the sludge thickener, substitution of helical pumps and replacement of the band filter by a centrifuge decanter..
 

Capacity

The design of the plant is for a daily average flow of 2500 m3 and an equivalent population of 7,500 people. The WWTP’s yield concerning the BOD5’s reduction is 96%.  
 

We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies.