We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies.
Water treatment is our primary need
Studies, consulting
Water treatment
$USD 12,453,458,22
Completed 2015-2017
The project CONSTRUCTION OF THE CHIQUIHURCU - PELILEO DRINKING WATER SYSTEM is divided into:
1. DRIVING LINE. - The project begins in the town of Apatug, Parroquia Juan Benigno Vela de la city of Ambato, Province of Tungurahua; with a length of 19,940 meters in ductile iron pipe and Steel until reaching the Teligote treatment plant in the community of the same name in the Pelileo canton.
Modular Type TREATMENT PLANT, with total of 4 units, and an installed capacity of
purification of 100 l / s. Each module includes the following treatments:
Aeration, Flocculation, Sedimentation, Filtration and Chlorination, and is to deliver drinking water to the city of Penile.
In high pressure PVC pipe and with a total length of 32,077 meters, the water is distributed through distribution tanks (TR) and
leads in several distribution lines to the 8 reservoir tanks, with capacities between 300 and 1,000 m3, located in rural parishes such as El Rosario, García Moreno, Catitahua, Bolívar, Huambaló, Benítez and Pelileo urban parish, belonging to the Pelileo canton in the Province of Tungurahua.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies.
A10 - Inspection of the Construction of the Drinking Water System Chiquihurcu - Pelileo (Ecuado)
Pelileo Country, Ecuador
Markets:
URBAN WATER NETWORK ,
Services:
ARCHITECTURE & DESIGN ENGINEERING STUDIES ENVIRONMENTAL SERVICES PROGRAM, ADVISORY & PROJECT MANAGEMENT
Client:
Gobierno Autónomo Descentralizado Municipal de San Pedro de