Project Development for access to ZAL (Zone connected with logistic activity of Valencia Harbour)

Valencia, Spain

  • Markets:

    MASTER PLANNING , ROADS, HIGHWAYS, BRIDGES AND TUNNELS , ENVIRONMENTAL STUDIES & PLANNING ,

  • Services:

    ARCHITECTURE & DESIGN ENGINEERING STUDIES CONSTRUCTION MANAGEMENT ENVIRONMENTAL SERVICES PROGRAM, ADVISORY & PROJECT MANAGEMENT

  • Client:

    Autoridad Portuaria de Valencia

Fast and safe roads need to be in accordance with the region growth

  • Include:

    Consulting, Project Management

  • Area:

    Roads-Highways

  • Cost:

    € 14.241.592,17

  • Status:

    Completed 1999-2003

Solutions presented in the project

Project development of access to the zone connected with logistic activity of Valencia Port aiming to improve connections between city and surroundings.
• The first one means creation of access to the new part of Valencia port connected with logistic activity, excluding the necessity of passage through the city, in order to reduce traffic. 
• The second one is connected with improvement of access roads to the town. The aim of the Company was to improve traffic between roads V-30 and V-15 so the slip road leading from V-15 to V-30 road was replaced by loop road with appropriate radius and symmetry. 

The existing two-lane leading road to the port was completed with two additional lanes

Two additional lanes, one in direction of Valencia and the second in direction of Z.A.L. Additionally other ameliorations were developed, such as: road to the nearby church La Punta, and cyclist path connecting Valencia with Pinedo beach. 
 