We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies.
Better integration in the immediate environment and recover adjacent areas for the construction of roads
Consulting, Project Management
Railway system
€ 30.457.000,00
Completed 2002-2008
• Slopes Stabilization creates a vegetation cover that will stop the erosion surface and also facilitate environmental integration of the road.
• Recovery of degraded soils platform construction.
• Defence and work structures.
Besides crops and plantations, other complementary actions were projected as signalling natural vegetation areas for the protection and recovery of vegetal upper soil lay, that would be affected by the work, and for a later use in the restoration of soil and vegetation.
The type of restoration projects of plants is compatible with the ecological characteristics of the environment and landscape through which the road passes, the utilization of seedling and the plantation of native species, well adapted to the environmental conditions, so assured treatment success while maintaining low costs.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies.
Project Study and Control of Works at the Platform of New Railway Access of Levante High Speed Train . Madrid- Castilla La Mancha- Valencia Region- Murcia Region. Environmental Intregation
Spain
Markets:
URBAN PLANNING , ENVIRONMENTAL STUDIES & PLANNING , RAILWAYS ,
Services:
ARCHITECTURE & DESIGN ENGINEERING STUDIES CONSTRUCTION MANAGEMENT ENVIRONMENTAL SERVICES PROGRAM, ADVISORY & PROJECT MANAGEMENT
Client:
Gobierno de España / A.D.I.F. (Administrador de Infraestructuras Ferroviarias)