Landscape Integration Project Redaction for the extension studies of the Valencia Metro Line 5. Sections: Airport – Riba - roja de Turia. Basic Project: section Riba - roja de Turia - Villamarxant
Metro line 5
4,623.74m²
€ 46.570.506,00
Completed
The segment has a total length of 4623.746 meters. Between the initial mileage and mileage 3+200.036, the layout adheres with the existing platform site from the old suburban railway Valencia-Llíria. From this point, the new platform goes along the corridor where is the CV 370, between Turia’s bed and Mullo of Crusa’s mountain, then go through Oms and Teulada’s torrents thanks to two separate viaducts, which section allow a flow path corresponding to a return pe- riod of 500 years. Vilamarxant Stop is located near the city center.
.
We use cookies on our website to give you the most relevant experience by remembering your preferences and repeat visits. By clicking “Accept All”, you consent to the use of ALL the cookies.
STUDIES ON METRO LINE FIVE
Valencia, Spain
Markets:
ENVIRONMENTAL STUDIES & PLANNING , SUSTAINABILITY , SMART CITIES , RAILWAYS ,
Services:
ARCHITECTURE & DESIGN ENGINEERING STUDIES ENVIRONMENTAL SERVICES
Client:
Generalitat Valenciana / Conselleria de Infraestructuras y Transporte - G.T.P. (Ente Gestor de Transportes y Puertos)